Renovating an apartment or commercial unit in a concrete high-rise often brings a frustrating reality: your dream layout clashes with rigid plumbing lines. You’re not alone—many property owners and contractors ask, “Can you relocate plumbing drains in concrete high-rise buildings?” The short answer is yes, but it’s far from simple. In this guide, we’ll walk you through the realities, risks, costs, and best practices—so you avoid $10,000 mistakes before the first jackhammer hits.
What Makes Drain Relocation in Concrete High-Rises So Challenging?
Concrete high-rises—especially those built before the 1990s—feature post-tensioned slabs or reinforced concrete floors that house critical structural elements. Unlike wood-frame homes where rerouting pipes is relatively straightforward, altering drain lines here means cutting through up to 8–12 inches of solid concrete, often laced with steel rebar or tension cables.
According to the International Plumbing Code (IPC), any modification to a building’s drainage system must maintain proper slope (typically ¼ inch per foot) and avoid compromising structural integrity. In high-rises, you’re also dealing with stacked plumbing: your drain likely connects directly to units below. A misstep could cause backups, leaks, or even structural damage.
💡 Did you know? A 2023 study by the American Society of Civil Engineers found that 68% of plumbing-related structural failures in high-rises stemmed from unauthorized or poorly executed drain relocations.
Is It Even Legal to Move Drains in a High-Rise Building?
Yes—but only with approvals. Most condominium associations and commercial landlords require:
- Architectural review
- Mechanical/plumbing permit from the local building department
- Structural engineer sign-off (especially for post-tensioned slabs)
- Coordination with the building’s master plumber
Ignoring these steps can void your insurance and lead to forced restoration at your expense. Always check your building’s CC&Rs (Covenants, Conditions & Restrictions) before planning any work.
For context, post-tensioned concrete contains high-strength steel tendons under extreme tension. Cutting one accidentally can cause catastrophic slab failure.

Step-by-Step: How to Relocate a Drain in a Concrete High-Rise
Step 1: Conduct a Non-Destructive Scan
Use ground-penetrating radar (GPR) or concrete X-ray to map rebar, conduits, and post-tension cables. Cost: $500–$1,500, but it’s non-negotiable.
Step 2: Hire a Structural Engineer
They’ll assess load paths and approve cut locations. Never rely on a general contractor alone.
Step 3: Design the New Drain Path
- Maintain minimum 2% slope toward the main stack
- Use 3-inch or 4-inch PVC (per IPC Table 702.1)
- Avoid horizontal runs longer than 6 feet without cleanouts
Step 4: Core or Saw-Cut the Concrete
- Use a diamond-tipped concrete saw with water cooling to reduce dust
- Cut only to the depth approved by the engineer (typically 4–6 inches, not full slab depth)
Step 5: Install the New Drain & Patch
- Embed pipes in non-shrink grout
- Reinforce with fiber mesh
- Cure for 72 hours before loading
Step 6: Pressure & Drain Testing
- Fill the system with water for 15 minutes
- Check for drops or leaks—zero tolerance in high-rises
Pros vs. Cons of Relocating Drains in Concrete Slabs
| Pros | Cons |
|---|---|
| ✅ Enables modern layouts (e.g., moving a bathroom) | ❌ Costs $5,000–$20,000+ depending on complexity |
| ✅ Increases property value if done correctly | ❌ Risk of damaging structural elements |
| ✅ Solves chronic drainage issues | ❌ Requires 2–6 weeks of approvals and coordination |
| ✅ Permitted in most cities with proper engineering | ❌ May void warranties or HOA compliance |
When Should You Avoid Moving a Drain?
Consider alternatives if:
- Your slab is post-tensioned and GPR shows no safe path
- The building is older than 1970 (asbestos or outdated stacks)
- You’re on a tight budget—relocation often costs 3–5x more than surface reroutes
- Your unit is above critical spaces (e.g., server rooms, lobbies) where leaks are unacceptable
In these cases, upflush toilets (like Saniflo systems) or wall-mounted fixtures that tie into existing vents can be smarter, code-compliant workarounds.
Real-World Example: NYC Condo Renovation Gone Right
In 2024, a Manhattan condo owner wanted to shift their master bathroom 8 feet east. The slab was post-tensioned.
Solution:
- Hired a GPR firm: found a 12-inch-wide “safe zone” between cables
- Structural engineer approved a shallow 5-inch cut
- Used a 3-inch cast-iron to PVC transition to match the stack
- Total cost: $12,500, including permits and testing
- Project completed in 18 days with zero issues
“It was expensive, but worth it. We got the bathroom of our dreams—and the HOA approved everything upfront,” said the homeowner.
FAQ: Can You Relocate Plumbing Drains in Concrete High-Rise Buildings?
Q1: How much does it cost to relocate a drain in a high-rise concrete floor?
A: Typically $5,000–$20,000. Factors include slab type, pipe material, engineering fees, and local labor rates. Simple surface reroutes (no concrete cutting) may cost under $2,000.
Q2: Can I do this as a DIY project?
A: Absolutely not. Cutting into structural concrete without engineering oversight risks life-threatening collapse in post-tensioned slabs. Always hire licensed professionals.
Q3: How long does the process take?
A: Allow 4–8 weeks total: 1–2 weeks for approvals, 1 week for scanning/engineering, 3–5 days for cutting/installation, and 1 week for inspections.
Q4: Will this affect units below me?
A: It shouldn’t if done correctly—but the main stack connects vertically. Any mistake can cause backups or leaks in lower units. That’s why building management must be involved.
Q5: Are there code-compliant alternatives to cutting concrete?
A: Yes! Consider:
- Upflush toilet systems (Saniflo)
- Wall-hung toilets tied to existing risers
- Relocating only supply lines, not drains
These avoid slab penetration entirely.
Q6: What permits do I need?
A: At minimum:
- Plumbing permit
- Structural alteration permit (in most jurisdictions)
- HOA/condo board approval
Check with your city’s building department—requirements vary by location.
Conclusion
So, can you relocate plumbing drains in concrete high-rise buildings? Yes—but it demands expertise, approvals, and respect for the building’s structural and plumbing systems. Done right, it unlocks transformative design possibilities. Done wrong, it risks safety, budgets, and neighbor relations.
If you’re planning a renovation, start with a GPR scan and a structural engineer—not a jackhammer. Share this guide with your contractor to ensure everyone’s on the same page!
👉 Found this helpful? Share it on Twitter or LinkedIn to help fellow renovators avoid costly mistakes!

Leave a Reply