Planning a bathroom remodel or new build? One of the most criticalโand often intimidatingโsteps is how to rough in plumbing for a bathroom. Get it wrong, and youโll face leaks, code violations, or expensive rework. But done right, it sets the foundation for a smooth, efficient, and leak-free bathroom for decades. Whether youโre a DIYer or just want to understand what your plumber is doing, this guide walks you through every essential stepโsafely, accurately, and in line with modern plumbing codes.
What Does โRough-In Plumbingโ Mean?
โRough-in plumbingโ refers to the initial installation of water supply lines, drainpipes, and vent stacks before walls and floors are finished. At this stage, fixtures like sinks, toilets, and showers arenโt installed yetโbut their pipe connections are precisely positioned for future use.
According to the International Residential Code (IRC), rough-in work must comply with local plumbing codes, which often align with the Uniform Plumbing Code (UPC) or International Plumbing Code (IPC). Skipping inspections or misaligning pipes can lead to failed inspections or functional issues later.
๐ก Pro Tip: Always check with your local building departmentโrequirements for pipe sizing, venting, and fixture spacing can vary by region.
Tools & Materials Youโll Need
Before you start, gather these essentials:
- Pipes:
- Drain/Waste/Vent (DWV): Typically 3″ or 4″ PVC for toilets; 1.5″โ2″ for sinks/showers
- Water Supply: ยฝ” PEX or copper for hot/cold lines
- Fittings: Elbows, tees, couplings, closet flanges
- Tools:
- Pipe cutter or hacksaw
- Tape measure (laser preferred for accuracy)
- Level
- PVC primer & cement (for DWV)
- Crimping tool (for PEX)
- Safety Gear: Gloves, goggles, dust mask
Note: PEX is now the most common water supply material in U.S. residential construction due to its flexibility, freeze resistance, and ease of installation (source: Wikipedia โ PEX ).

Step-by-Step: How to Rough In Plumbing for a Bathroom
Follow these steps in order to ensure code compliance and long-term reliability.
1. Plan Your Layout Using Standard Fixture Dimensions
Start with a scaled bathroom blueprint. Use standard rough-in distances:
Toilet | Floor level (with flange) | 5″โ6″ | 12″ from wall (standard) |
Sink | 18″โ20″ | 20″โ22″ | Centered under future vanity |
Shower | 8″โ10″ | 48″โ60″ | Centered in stall area |
Tub | 12″โ14″ | 20″โ22″ | Per tub manufacturer specs |
โ ๏ธ Critical: Toilet flange must sit flush with finished floorโnot subfloor. Account for tile or flooring thickness!
2. Install the Drain-Waste-Vent (DWV) System
- Begin with the main stack (vertical vent pipe that exits through the roof).
- Connect fixture drains using proper slope: ยผ” per foot toward the main drain.
- Example: A 4-foot run from shower to stack needs a 1″ drop.
- Use sanitary tees (not regular tees) for horizontal-to-vertical connections to prevent clogs.
- Install vent pipes within 5 feet of each trap (per IPC) to prevent siphoning.
3. Run Water Supply Lines
- Use ยฝ” PEX tubing for both hot and cold lines.
- Keep hot and cold lines at least 6″ apart to reduce heat transfer.
- Install shut-off valves (or stub-outs with caps) at each fixture location:
- Toilet: One cold line, 5″โ6″ above subfloor
- Sink: Two lines (hot/cold), 20″โ22″ high, 4″ apart
- Shower/Tub: Mix valve rough-in at 48″โ60″
๐ง Best Practice: Pressure-test supply lines at 80 PSI for 2 hours before closing walls. No drop = no leaks.
4. Secure Pipes & Pass Inspection
- Strap all pipes every 4 feet (horizontally) and 10 feet (vertically).
- Protect pipes near framing edges with steel nail plates if within 1.25″ of surface.
- Schedule a rough-in plumbing inspection before drywall goes up. Most jurisdictions require this by law.
Common Mistakes to Avoid
Even experienced DIYers slip up here:
- โ Ignoring venting: Unvented traps lose their water seal โ sewer gases enter your home.
- โ Wrong toilet flange height: Too high = rocking toilet; too low = leaky seal.
- โ Over-tightening PVC joints: Causes cracks and leaks. Hand-tight + ยผ turn is enough.
- โ Skipping the pressure test: A tiny pinhole leak can cause $10,000+ in water damage.
FAQ: How to Rough In Plumbing for a Bathroom
Q1: How much does it cost to rough in bathroom plumbing?
A: For a standard 3-fixture bathroom (toilet, sink, shower), professional rough-in costs $1,500โ$3,500, depending on location and complexity. DIY can save 40โ60%, but only if youโre confident in code compliance.
Q2: Can I rough in plumbing myself?
A: Yesโif your local code allows it and you pull a permit. However, always get an inspection. Mistakes hidden behind walls are expensive to fix later.
Q3: Whatโs the standard toilet rough-in distance?
A: 12 inches from the finished wall to the center of the closet flange is standard in the U.S. (10″ or 14″ versions exist for older homes).
Q4: Do I need a vent for every fixture?
A: Not necessarily. Fixtures can share a vent via a wet vent or common vent stack, but each trap must be vented within code-specified distances (usually โค5 ft for 1.5″ pipes).
Q5: Should I use PVC or ABS for drain pipes?
A: Both are code-approved. PVC (white) is more common in the South and West; ABS (black) is popular in colder climates due to better impact resistance. Never glue them togetherโthey require a special transition coupling.
Q6: How do I know if my rough-in passed inspection?
A: The inspector will stamp your permit or provide a written approval. If failed, theyโll list corrections needed (e.g., โadd vent within 36โ of sink trapโ).
Conclusion
Knowing how to rough in plumbing for a bathroom correctly saves time, money, and headaches down the road. By following standardized dimensions, using the right materials, and respecting plumbing codes, you create a reliable foundation for your bathroomโs lifetime.
If youโre tackling this as a DIY project, never skip the inspectionโitโs your safety net. And if you found this guide helpful, share it with a friend planning a bathroom upgrade! ๐ง
๐ Like this post? Share on Facebook, Pinterest, or Twitter to help others avoid plumbing pitfalls!
Remember: Great bathrooms start undergroundโwith smart, code-compliant rough-in work.
Leave a Reply