How Long Does It Take To Rough In Plumbing? (2025 Guide)

Home » How Long Does It Take To Rough In Plumbing? (2025 Guide)

If you’re building a new home or remodeling your bathroom, you’ve probably asked yourself: “How long does it take to rough in plumbing?” It’s a crucial phase that sets the foundation for your entire plumbing system—and delays here can ripple through your whole project. Whether you’re a DIYer planning ahead or a homeowner coordinating with contractors, understanding realistic timelines can save you time, money, and stress.


What Is Plumbing Rough-In?

Before diving into timelines, let’s clarify what “rough-in plumbing” actually means. The rough-in phase is the stage where plumbers install water supply lines, drainpipes, vents, and fixture stub-outs—all hidden behind walls and under floors—before drywall or finishes go up.

This isn’t the final plumbing work. Instead, it’s the skeleton of your system: pipes are in place, but faucets, toilets, and showers aren’t installed yet. Once rough-in is complete, inspectors check the work, and then other trades (like electricians and drywallers) can proceed.

💡 Pro Tip: According to the International Residential Code (IRC), all rough-in plumbing must pass inspection before walls are closed up. Skipping this step can lead to costly rework.


How Long Does It Take To Rough In Plumbing? (By Project Type)

The answer depends heavily on your project’s size, complexity, and crew size. Here’s a realistic breakdown based on industry data from sources like HomeAdvisor and the National Association of Home Builders (NAHB):

Single Bathroom Remodel1–2 daysSimple layout, minimal rerouting
Full Kitchen + 2 Baths3–5 daysModerate complexity; includes venting
New 2,000 sq ft Home5–7 daysFull DWV (drain-waste-vent) and supply lines
Custom Luxury Home7–14+ daysMultiple bathrooms, tankless water heaters, complex fixtures

📊 Real-World Example: A 2023 case study by Fine Homebuilding tracked a 2,200 sq ft custom home in Colorado. The rough-in took 6 full days with a 3-person crew due to radiant floor heating integration and a rainwater harvesting system.

How Long Does It Take To Rough In Plumbing

5 Key Factors That Affect Rough-In Plumbing Time

1. Home Size and Layout

More square footage = more fixtures = more piping. Open-concept homes may speed up work, while multi-story layouts add vertical complexity (especially for vent stacks).

2. Type of Plumbing Materials

  • PEX tubing: Faster to install (flexible, fewer fittings).
  • Copper or PVC: Require more cutting, soldering, or gluing—slower but durable.
    According to This Old House, PEX can reduce rough-in time by up to 30% compared to traditional materials.

3. Access and Framing Condition

If walls are already framed with labeled stud bays and pre-cut holes, plumbers move faster. Unfinished basements or crawl spaces? That adds time for trenching or drilling.

4. Permitting and Inspection Schedules

In cities like Los Angeles or New York, inspection wait times can add 2–5 business days to your timeline—even if plumbing is done in 2 days.

5. Plumber Experience & Crew Size

A solo handyman might take twice as long as a licensed 2-person team. Always verify credentials—licensing and insurance matter for both speed and safety. (Learn more about plumbing codes on Wikipedia .)


Step-by-Step: What Happens During a Plumbing Rough-In?

Here’s how professionals typically approach the job:

  1. Review Blueprints
    Confirm fixture locations (toilets, sinks, showers) and pipe routes.
  2. Install Drain-Waste-Vent (DWV) System
    • Run 3″–4″ main drain lines (slope: ¼” per foot).
    • Install vent pipes through the roof to prevent suction traps.
  3. Run Water Supply Lines
    • Hot and cold lines (usually ½” PEX or copper).
    • Stub-outs extend 6–8 inches from wall for future fixtures.
  4. Pressure Test the System
    Fill supply lines with 60–80 PSI of air or water for 15+ minutes. No drop = pass.
  5. Schedule Inspection
    Local building department checks for code compliance (e.g., proper trap placement, vent height).
  6. Coordinate with Other Trades
    Once approved, electricians and HVAC techs can safely work in the same space.

⚠️ Warning: Never skip the pressure test. A hidden leak behind drywall can cause $10,000+ in water damage later.


Common Mistakes That Delay Rough-In Plumbing

  • Changing fixture locations mid-project → Requires rerouting pipes.
  • Poor coordination with framers → No access holes = extra drilling.
  • Using unlicensed labor → Higher chance of failed inspection → rework.
  • Ignoring local code variations → E.g., California requires earthquake straps on water heaters.

FAQ: Your Top Questions Answered

Q1: Can rough-in plumbing be done in one day?

A: Yes—for a single bathroom remodel with simple access and no surprises. But for whole-house projects, 3–7 days is standard. Rushing increases error risk.

Q2: How much does rough-in plumbing cost?

A: On average, $8–$12 per square foot for new construction. A 2,000 sq ft home = $16,000–$24,000. Remodels vary widely based on access and complexity.

Q3: Do I need a permit for plumbing rough-in?

A: Yes, in virtually all U.S. jurisdictions. Permits ensure safety and code compliance—and are required for resale documentation.

Q4: What’s the difference between rough-in and finish plumbing?

A: Rough-in = hidden pipes and drains. Finish plumbing = installing visible fixtures (toilets, faucets, showerheads) after walls are finished.

Q5: Can I DIY rough-in plumbing?

A: Technically yes—but not recommended unless you’re experienced. Mistakes can fail inspection, cause leaks, or violate insurance policies. Most lenders require licensed work for new builds.

Q6: How do I prepare for a plumbing rough-in?

A:

  • Finalize all fixture locations early.
  • Ensure framing is complete with labeled stud bays.
  • Confirm utility shut-offs are accessible.
  • Share your timeline with all contractors to avoid clashes.

Conclusion: Plan Smart, Build Smooth

Knowing how long it takes to rough in plumbing isn’t just about counting days—it’s about avoiding costly delays and ensuring a safe, efficient system. Whether you’re building a cozy cottage or a modern mansion, realistic timelines, skilled labor, and smart coordination make all the difference.

Key Takeaway: For most homes, budget 5–7 days for rough-in plumbing—but always add a 2–3 day buffer for inspections and surprises.

If this guide helped you, share it with a friend who’s tackling a renovation! Got questions? Drop them in the comments—we’re here to help you build with confidence.

📌 Follow us on social media for more expert home-building tips!